Refer to Commission Rule 165:10-21 PART 17 for Qualification Criteria and Application Procedures.
INSTRUCTIONS for preparing FORM 1535
Check Box and Fill Out RESERVOIR DEWATERING PROJECT section and other sections that are applicable
Minimum required attachments:
- A) Initial production test or data indicating 5:1 water/oil or water/gas ratio
- B) Structure and isopach maps of applicable reservoir
- C) Schematic diagram of electrical grid and dewatering and water disposal equipment